Guest Post by David Vardy
There are remarkable similarities between the
business model for Muskrat Falls and a Ponzi scheme, credited to Charles Ponzi,
who instigated the first Ponzi scheme in 1919.
Bernard Madoff was one of many who built upon the
original Ponzi concept. Madoff met his Waterloo in March 2009, when he pleaded guilty to 11 federal felonies, including securities fraud, wire fraud, mail fraud, money laundering, making false statements, perjury, theft from an employee benefit plan, and making
false filings with the SEC. Will Muskrat Falls lead to such a wide
range of criminal charges after the Commission of Inquiry has concluded?
The business model for Muskrat Falls is built upon
fictitious energy sales which created unearned revenues. Electricity consumers
were conscripted to participate in these fictitious sales through amendments to
the Electrical Power Control Act which conferred monopoly power upon Nalcor, so
that all large consumers of power were required to buy power generated at
Muskrat Falls.
These fictitious energy sales were embodied in a
power purchase agreement between Nalcor Energy and its subsidiary NL Hydro.
This agreement was a take-or-pay agreement which required NL Hydro and its
customers to buy the power regardless of whether any market exists for the
power. The PPA was pledged as a mortgage to the federal government who provided
the loan guarantee. Why did the federal government accept such weak collateral
for such a large loan?
Charles Ponzi |
This Ponzi deal claimed that energy demand would
rise from 7 billion kilowatt hours to 10.5 billion kilowatt hours within 15
years. This ignored the simple demographics of a declining and aging
population. It also ignored the fact that if rates rise then people will seek
other alternatives. Government can legislate the monopoly power of Nalcor but
they cannot force people to consume electricity when alternatives are
available, such as oil heating, heat pumps, wind and solar power and improved
insulation. Economic analysis reveals that when power rates double the demand
for power will fall by 40% or more. Consumption will drop from 7 billion
kilowatt hours to almost 4 billion. This means that demand for Muskrat Falls
power will vanish, along with the additional revenues needed to pay the $800
million in additional costs.
Compounding the fictitious demand is the
falsification of construction and operating cost estimates. The CBC confirmed the Uncle
Gnarley Blog's report that cost estimates had been falsified to achieve project
sanction
A senior engineer who worked on Muskrat Falls says
Nalcor Energy should be subjected to a thorough forensic audit to find out how
the Crown corporation arrived at the "ridiculously low" initial cost
projection for the hydro megaproject.
"The unit prices used to generate the estimate
were far too low and did not represent the reality of harsh construction
environment of central Labrador," the engineer said.
"The risks were vastly understated and the
contingencies absurdly low."
The engineer — whose identity CBC News has agreed
to protect, because he is not authorized to speak publicly about his work on
the project — believes that "the purpose of this estimate was not to
generate an estimate for project implementation, but secure project
sanction."
The Muskrat Falls project depends upon the timely
release of water from the giant reservoirs at the Upper Churchill. Hydro Quebec
has control over all power generated at Churchill Falls, except for 300 MW of
Recall power and 225 MW of power to replace Twin Falls. The only issue in question
is whether the Renewal Agreement which applies to the last 25 years, from
September 1, 2016 to August 30, 2041, of the 65 year power contract, gives
Hydro Quebec the same rights as they had for the first 40 years.
The Quebec Superior Court ruled in August 2016 that
Hydro Quebec’s rights remained unimpaired until 2041 and did not change at the
end of the first 40 years. Nalcor had relied on a Water Management Agreement to
which Hydro Quebec was not a signatory in order to give the Churchill Falls Corporation
the power to manage the water flow and to allow for the banking of water and
energy between Nalcor and Hydro Quebec. The Quebec Superior Court decision
allows Hydro Quebec to ignore any effort to coordinate power production through
the impotent Water Management Agreement. Without such coordination Muskrat
Falls will not achieve its full energy and capacity output.
Philip Raphals (Muskrat Falls contribution to
the reliability of the Island Interconnected system, October 17, 2016)
concludes that unless the Quebec Superior Court decision is overturned on
appeal or made irrelevant by a negotiated agreement with Hydro-Quebc, the power
available to Nalcor will be limited depending on the flows in the Churchill
River. He concludes that the firm capacity available to Hydro – after taking
into account the obligation to deliver 167 MW to Nova Scotia – is probably
limited to about 211 MW, far below the reputed capacity of 824 MW. “The
unavoidable implication is that the capacity balance … systematically overstates
firm capacity available to the IIS, perhaps by up to 400 MW.”
What is the essence of a Ponzi or Madoff scheme?
Surely it has to be “impairment of value”. Impairment of value arises when
fictitious demand for electricity is transformed into fictitious assets and
when fictitious cost estimates are compounded by fictitious supply of power.
Charles Ponzi assured investors they would make a
profit. As long as the money was flowing in it kept flowing out. Ed Martin
promised great returns flowing from Muskrat Falls. On September 29, 2015, in a
press release by Nalcor Energy, CEO Ed Martin said that Muskrat Falls would
generate $60 billion in “savings and revenue to the province over the next 50
years.” The November 24, 2015 response to my ATIPPA request cites an incredible
$61,848,209,000 in savings and benefits, including $27 billion in “cumulative
present worth” savings
over the isolated Island alternative and $17 billion in dividends.
On December 17, 2012, while announcing the
sanctioning of Muskrat Falls, former Premier Dunderdale made the following
statement:
Muskrat Falls will provide the province
with a stable revenue stream and will not impact net debt. The
project will also generate estimated revenues in excess of $20 billion over 50
years once it comes onstream. (My
bolding)
On December 20, 2012 Finance Minister Tom Marshall
said in the House of Assembly that Muskrat Falls
will pay a dividend to the people of
Newfoundland and Labrador of in excess of $20 billion, starting in 2017 for the
life of the project. If we were to include estimates of sales of surplus power
into the American markets, it would be over $24 billion.
The 2015 Budget Speech by Finance Minister Ross
Wiseman contained the following statement about the recovery of the province’s
investments over a mere eight years.
Government's last equity injection in
Nalcor will be in 2017-18. Over a total investment period of 10 years, the
provincial government will have invested $3.1 billion in Nalcor. Every penny
of that money will be returned to the province by 2025-26.
From that time on, the dividends continue to increase for Newfoundlanders and
Labradorians. (My bolding.)
Can we hear the voice of Charles Ponzi and Bernie
Madoff in these preposterous claims?
In the current instance governments and Crown
Corporations are the players and the citizens are the victims. Will criminal
charges be laid from this deception and fraud? What role will the Commission of
Inquiry and its forensic audit play in its disclosure and in identifying
whether public institutions acted against the public interest?
In spite of these fictions, the Auditor General
makes the following comments on Muskrat Falls in his recent report:
The existing Muskrat Falls business,
regulatory and financial structure ensures costs, expenses or allowances
related to the Project will be recovered, in full, from ratepayers in the
Province. Because the structure ensures there will be sufficient revenue
generated from ratepayers over the life of the project to cover the capital and
operating costs of Muskrat Falls, it is unlikely that the Muskrat Falls assets
would be considered impaired in value on the financial statements of Nalcor.
I have already expressed, in a previous Uncle
Gnarley post, my disagreement with these statements. No such assurance of
recovery, as claimed by the AG, exists. “Impairment in value” is a virtual
certainty and far from “unlikely”.
In the Public Accounts of the Province, facilities
costing $12.7 billion or more are recorded on the credit side as liabilities,
representing the money borrowed, or to be borrowed (totalling $4 billion). On
the debit, or asset, side they are recorded as fully offsetting share
certificates in Muskrat Falls. Value is based on the $12.7 billion in
construction cost. Inevitably there will be a write-down and that is when the
impairment will be officially recorded, meaning that net debt of the province
will show the impact of the project on our finances.
If the assets are written down to $8.7 billion then
the federal government and Emera will be fully protected but the NL government
will have lost out. The province’s share value will be zero. The debt incurred
by the province will remain, with no offsetting assets, so our net debt will
rise from $14.6 billion (projected for March 31, 2018) to $18.6 billion. If the
write-down reduces asset values from $12.7 billion to $4 billion then the
federal government will lose $3.9 billion as will federal taxpayers while the
province’s net debt will rise to $18.6 billion. Bondholders, protected by a
federal loan guarantee, will be saved harmless.
PlanetNL has concluded that if the value Muskrat
Falls measured by the present value of earnings, a well-accepted method among
appraisers, then the assets will have zero value. In this event we will have
lost our full equity investment of $4 billion. Before this happens will we be
required to inject even more equity capital if the cost escalates further as a
result of our completion guarantee?
Should the AG for NL now investigate the fictitious
unearned revenues, electricity demand projections, cost estimates and the
misrepresentation of power supply available? Should the AG also review the
contingent liabilities of the province to determine if the Public Accounts
fully represent the recourse to the province provided in the loan guarantee
agreement, which can be triggered by further cost escalation (the completion
guarantee embodied in Schedule A section 2 of the 2012 loan guarantee
agreement).
Yes Muskrat Falls is a Ponzi scheme, grounded on
fiction and deceit. However, the $12.7 billion and rising cost is not fiction.
The costs are real. We must begin with straight talk as to where we are, how we
got here and how to escape from the Ponzi scheme we have constructed for
ourselves.
The appointment of a Commission of
Inquiry should be the beginning of this process but only if the terms of
reference are sufficiently broad and if the Commissioners selected have the
necessary skills for this daunting task.
David Vardy