Monday, 17 January 2022

#DARKNL WAS BAD. A NEW REPORT ON LIL WILL LEAVE YOU COLDER.

 The recent release by the PUB of the second Haldar Associates Report represents a timely and sobering analysis of the findings of its investigation into, among other things, the reliability of the Labrador Island Link (LIL).

The NL public should not need to be reminded that last week marked the seventh anniversary of #DarkNL. That was a week in which many people, especially those living on the Avalon, came face to face with the worst consequences of public sector incompetence, a matter confirmed and chronicled by the Liberty Consulting Group for the Public Utilities Board (PUB). 

It also caused the downfall of an incompetent Premier. Sadly she was replaced, successively, with a bevy of incompetent successors.

The 2014 widespread outage could easily have had far worse consequences than those recorded.

Unbeknownst to most people, the winter of 2021 might have been the year, had the Holyrood Thermal Generating Station been shuttered as planned. This is one of the takeaways of the second Haldar Report.

A short history: A January 11, 2021 incident report, internal to Nalcor, reported damages on eight towers due to the formation of rime ice during a sleet storm in southern Labrador, a fact given no notice in the media until after it was reported on the Uncle Gnarley Blog. When the Liberty Consulting Group employed by the PUB reported in February, the public learned that the problem was worse than initially noted. The consultant informed that “16 areas have been identified as experiencing electrode line conductor damage...” in the ice storm.

At the time, multiple engineers confirmed privately to the author that the damages on the LIL were far more serious than Nalcor was admitting. Those allegations turned out to be true. Nalcor confirmed the following month that “[i]n total, 36 electrode line conductor spans required conductor splicing, repair, or restringing, as well as 11 cross arms required repair or replacement.”

The main repair work was completed by February 25, 2021, though part of the work was performed later.

Liberty noted that some of the repair sites required “snow clearing of approximately 65 km.” They essentially confirmed one engineer’s assertion that “after the first 140” kilometers (south of Goose Bay), off-road access and conditions along the LIL are a “logistical nightmare.”

That is because easy access via the Trans Labrador Highway ends and conditions, including the period of the spring thaw, make the LIL service access road virtually impassable by heavy equipment.

Last year’s repair period ran for six weeks. The crisis of #DarkNL in January 2014 ran for just one week. 



The Haldar Report informs us that the integrity of the LIL is essentially under threat every winter season because the LIL is far more susceptible to extreme weather events than initially forecast. 

The conclusion bears directly on the robustness of the transmission line, referred to as the “return standard”. (A return period of 50 years, for example, means the transmission line is designed to withstand weather conditions that will occur on average once in a 50-year period.) (Vol 2 CIMFP Vol. 2)

The latest Haldar Report conducted a “revised reliability analysis” using a “more extreme loading consideration” than that employed by Nalcor. The data “indicate[d] a probability of failure of 10% and a return period of 1:10 years.” 

Haldar’s assessment becomes even more sobering when “[o]ther outcomes include consideration of regional correlation (mainly weather and conditions affecting access for repair operations) and line length where the return period could be as low as 1:6 years with an associated annual failure rate of 16%.”

Haldar describes an optimal scenario in which, following a line failure, “unlimited resources” are available including multiple repair crews, heavy equipment, twenty-four hour work days, suitable weather conditions, experienced crews and an understanding of the issues involved. Under those ideal conditions, the Report states, “restoration could take up to seven weeks, depending on the circumstances of the failure.”

The potential of a weather-induced line failure once every six years implies monumental issues of power insecurity as well as life safety and financial implications for the whole economy of the province.  

The Haldar assessment was directed at ice loading and wind conditions in parts of southern Labrador, the Great Northern Peninsula, and the Avalon Peninsula, where extreme wind and icing conditions are almost legendary. Local engineers freely acknowledge the problem of remote access for heavy equipment during both the winter and the spring thaw. Others draw attention to the analysis performed at the pre-sanction stage of the project as well as to the warning of the DG-2 and DG-3 Reports of Manitoba Hydro International, the PUB and, eventually, Newfoundland Power Co. Ltd. Each entity raised serious issues with Nalcor’s LIL return standard, which the Public Inquiry validated.  

Worth mentioning, too, is that one of the issues on which MHI did not cave to GNL's and Nalcor's interference in the writing of their conclusions related to the issue of the proposed return standard. MHI wanted an LIL based upon a return period of 1:150 years using an alternate supply, and 1:500 years without an alternate supply...and "an even higher standard in the alpine areas."

Holyrood represented that alternative supply but closing it was the only basis Nalcor possessed for running with the Muskrat Falls project. 

Nalcor ignored the recommendation; the leadership was prepared to risk seeing the public freeze in the dark rather than risk skewering their dreams of megaproject stardom by preparing an honest project estimate. 


Returning to the Haldar Report, however, in 2019, NL hydro performed an exercise to confirm the restoration time of a TL failure. The outcome confirmed that “restoration could take up to seven weeks, depending on the circumstances of the failure.” Highly-experienced local electrical contractor, Locke’s Electric Limited, also conducted an analysis for Hydro. The company, states Haldar, “estimated restoration time frame of three to six weeks, depending on the scenario including logistics and line location.” 

In 2014, the public was rightly furious after just one week of extended and rolling blackouts. Think of a shuttered Holyrood plant and rolling blackouts for periods of three to six weeks or longer? 

The LIL return periods were previously defined by Nalcor “to be in the range of 1:73 to 1:160 years.” They could only have been based upon icing and wind conditions anywhere else but here. 

Nalcor was warned and proceeded with the project anyway, without performing the necessary design changes. 

Not unexpectedly, Nalcor “pushed back” on the Haldar Report in its latest submission to the PUB, suggesting that the consultant’s conclusions were based on “extreme values” and were, therefore, “overly conservative”. 

Nalcor accuses Haldar of drawing conclusions based on a lack of historical data, they offer no evidence on which to support their position. 

It is now, therefore — not in the middle of a long period of rolling blackouts — that we should be communicating with the PUB over the under-designed LIL transmission line.

If the public was furious about being left in the dark after a week during #DARKNL, think of seven weeks - or more - of rolling blackouts.