EVIDENCE OF MALFEASANCE?: A REVIEW OF THE FORENSIC
AUDIT REPORT INTO THE MUSKRAT FALLS PROJECT (PHASE II)
The second Forensic Audit Report prepared by the accounting
firm of Grant Thornton has now been released to the public. It will constitute
the major focus of Phase II, the “Construction Phase”, of the Commission of
Inquiry into the Muskrat Falls Project (MFP).
This Report builds on the main conclusions of the first one released
in September 2018, prior to the beginning of public hearings presided over by
Judge Richard LeBlanc. It concluded that, at the time of sanction, a
“combination of…potential misstatements may have resulted in the Interconnected
Island Option (the Muskrat Falls project) no longer being considered the least
cost option at the time of sanctioning.” In other words, had the Cumulative
Present Worth (CPW) – the present value methodology used to compare the
Isolated Island and the Interconnected Island options – been objectively assessed, the Muskrat Falls
Project was probably not then, or ever, “least-cost”.
What had GT uncovered in order to come to that conclusion?
The Uncle Gnarley Blog has a new website. Click here to visit www.unclegnarley.ca to view the latest posts!
Showing posts with label 2018. Show all posts
Showing posts with label 2018. Show all posts
Monday, 18 February 2019
Friday, 21 September 2018
FORENSIC AUDITOR CONFIRMS NALCOR UNDERSTATED COST ESTIMATES FOR MUSKRAT
This post co-authored with David Vardy
The Forensic Auditor's main conclusion was that based upon
its “findings and observations, at the time of sanctioning” a “combination
of…potential misstatements may have resulted in the Interconnected Island
Option (the Muskrat Falls project) no longer being considered the least cost
option at the time of sanctioning.”
In coming to this conclusion, Grant Thornton has confirmed long
held suspicions that Nalcor planned
to advance sanction of the MFP regardless of the consequences. Essentially, the
Forensic
Auditor chronicles a narrative that suggests recklessness on the part of Nalcor
Energy. The Forensic Audit was made public by the Commission of Inquiry September 21, 2018.