EVIDENCE OF MALFEASANCE?: A REVIEW OF THE FORENSIC
AUDIT REPORT INTO THE MUSKRAT FALLS PROJECT (PHASE II)
The second Forensic Audit Report prepared by the accounting
firm of Grant Thornton has now been released to the public. It will constitute
the major focus of Phase II, the “Construction Phase”, of the Commission of
Inquiry into the Muskrat Falls Project (MFP).
This Report builds on the main conclusions of the first one released
in September 2018, prior to the beginning of public hearings presided over by
Judge Richard LeBlanc. It concluded that, at the time of sanction, a
“combination of…potential misstatements may have resulted in the Interconnected
Island Option (the Muskrat Falls project) no longer being considered the least
cost option at the time of sanctioning.” In other words, had the Cumulative
Present Worth (CPW) – the present value methodology used to compare the
Isolated Island and the Interconnected Island options – been objectively assessed, the Muskrat Falls
Project was probably not then, or ever, “least-cost”.
What had GT uncovered in order to come to that conclusion?
The Uncle Gnarley Blog has a new website. Click here to visit www.unclegnarley.ca to view the latest posts!
Showing posts with label Forensic Audit Report to the Commission of Inquiry Respecting the Muskrat Falls Project Construction Phase December 17. Show all posts
Showing posts with label Forensic Audit Report to the Commission of Inquiry Respecting the Muskrat Falls Project Construction Phase December 17. Show all posts
Monday, 18 February 2019
Subscribe to:
Posts (Atom)