The Uncle Gnarley Blog has a new website. Click here to visit www.unclegnarley.ca to view the latest posts!

Showing posts with label Labrador Island Link faulty "popped" cable. Show all posts
Showing posts with label Labrador Island Link faulty "popped" cable. Show all posts

Thursday, 21 September 2017

IN PICTURES: NALCOR DUMPS MILLIONS

Nalcor’s lack of quality control on the Muskrat Falls project failed to detect a faulty transmission cable, containing a "popped" wire, which was strung — with the defect — on a large section of the Labrador Island Link.


CBC reported the issue in June 2016. Flabbergasted by what he had read, James L. Gordon, the Canadian engineer who has written repeatedly on the Uncle Gnarley Blog, contacted renowned transmission line designer J.P. Schell, P. Eng. (Ret’d) and asked him to examine the issue. Mr. Schell wrote a piece entitled Design Engineer Baffled By Extent of Muskrat TL Flaw Reported by CBC for this Blog.
The transmission cable (170 km X 2 lines = 340 km of D.C. conductor wire) was spun at the factory, shipped, stored and erected before anyone at Nalcor noticed — testimony to a management ill-equipped for the roles they fill.